Ok. So it has been a while since last post. I'll blame it on the Holiday's. Work has been sporadic on the box. However, I have been able to made progress and have managed to take some pictures along the way. So this will be the condensed version of the progress.

I left off last time with building the small partition which acts like a removable shelf. I cut the partition 1/8" oversize and created a stopped dado with a router plane. 

After fine tuning the partition fit, I also fitted and attached the bottom to the partition with a little glue and some cut nails.

Next was the installation of the butt hinges. I had planned to do an entire post just on installing them. However, that 'll need to wait for another day. 

I chose to mortise the hinges with a router and an exacto knife. Temporary screws are holding the lid on until the good ones can be installed after the finish is applied.

To align the hinge mortises, I positioned the box lid where I wanted it and then carefully created  tick marks on either side of the box mortise with an exacto knife.


Here is a picture of the finished hinges. The screw holes were drilled with a vix bit to ensure they are perfectly centered. They are ready to accept the finish screws after the shellac is applied.


 

My first try at butt hinges came out fairly well after a lot "hand-wringing". I'm pleased with the effort.

With the hinges out of the way I turned my attention to the decorative molding around the lid. This step was trickier that I thought it would be in order to get nice tight corners. Since the moulding is installed lower than the thickness of the lid, clamping was a challenge. 

Getting the proper length and angle on the molding was tricky with the chop saw. I have to remember to build a 45 degree fixture for my shooting board so it's easier to sneak up on the fit.



The next job was to mortise the latch for the lock in the inside of the lid. I made this job more difficult that it needed to be by not tackling it before installing the lid moulding. I marked out carefully with the exacto knife again and used a combination of small router plane and router. I planed down a piece of would that served as a rail for this operation.


And here are a few pictures of the Schoolbox thus far. 


 

 


 

 

So on to the final stages. I need to do some file work on the key hole with the escutcheon installed, and then start final sanding prep for the shellac finish.

Thanks for looking. 
Posted by Picasa

4 comments:

  1. Nice! After reading about the box, its really fun to see it in process and finally finished.

    I plan to make one of these .. some day. :)

    ReplyDelete
  2. It really was a great project. A great skill builder.

    ReplyDelete
  3. The box is looking great John. I just got my hardware from Horton and will be doig the hinges any day now. I'll make sure I fit the lock before the lid molding!

    ReplyDelete
  4. Download over 16,000 WOODWORKING Plans at here
    http://cnnwood.weebly.com/
    Arbor Projects ,
    Adirondack Chairs ,
    Artwork Display ,
    Bathroom Unit ,
    Box Designs ,
    Billiard/Pool Table ,
    Barn Plans ,
    Bed Plans ,
    Bedside Cabinets ,
    Bee Hive Plans ,
    Bench Projects ,
    Bird Feeders ,
    Birdhouse Plans ,
    Boat Plans ,
    Book Case Plans ,
    Baby Changing Table ,
    Coat Rack ,
    Cabin Plans ,
    Cabinet Plans ,
    Carport Plans ,
    Cart Plans ,
    Cat House Plans ,
    CD/DVD Holder ,
    Cellar Projects ,
    Chair Plans ,
    Chest Designs ,
    Chicken Houses
    Childrens Room Plans ,
    Clock Plans ,
    Coasters ,
    Coffee Table Designs ,
    Cold Frame Plans ,
    Compost Bin ,
    Computer Desk ,
    Containers ,
    Cradle Projects ,
    Small Crafts ,
    Cutting Board ,
    Deck Plans ..

    ReplyDelete